{"id":401773,"date":"2026-11-20T21:40:57","date_gmt":"2026-11-20T21:40:57","guid":{"rendered":"https:\/\/bizscoreai.com\/blog\/datacentres-carbon-emissions-2030-iea-report\/"},"modified":"2026-11-20T21:40:59","modified_gmt":"2026-11-20T21:40:59","slug":"datacentres-carbon-emissions-2030-iea-report","status":"publish","type":"post","link":"https:\/\/bizscoreai.com\/blog\/datacentres-carbon-emissions-2030-iea-report\/","title":{"rendered":"Datacentres to Create 70% More Carbon Emissions by 2030, IEA Report Warns"},"content":{"rendered":"<div class=\"post-quick-answer\" style=\"background:rgba(128,128,128,.08);border-left:4px solid rgba(128,128,128,.6);padding:14px 18px;margin:0 0 24px\">\n<p class=\"post-quick-answer-label\"><strong>Quick Answer<\/strong><\/p>\n<p>The International Energy Agency expects global datacentre electricity consumption to double by 2030, with AI accounting for three-quarters of the increase and sector carbon emissions rising by 70%. The forecast points to a sharp rise in energy demand from AI infrastructure, with the US and China relying heavily on fossil fuels to supply new capacity.<\/p>\n<\/div>\n<p><!--\/post-quick-answer--><\/p>\n<nav class=\"post-contents\" style=\"border:1px solid rgba(128,128,128,.35);border-radius:6px;padding:14px 18px;margin:0 0 28px\">\n<p><strong>In This Article<\/strong><\/p>\n<ul>\n<li><a href=\"#how-much-electricity-will-datacentres-consume\">How Much Electricity Will Datacentres Consume?<\/a><\/li>\n<li><a href=\"#why-are-datacentre-emissions-expected-to-rise\">Why Are Datacentre Emissions Expected to Rise?<\/a><\/li>\n<li><a href=\"#how-will-the-us-and-china-power-their-datacentres\">How Will the US and China Power Their Datacentres?<\/a><\/li>\n<li><a href=\"#how-large-is-the-datacentre-buildout\">How Large Is the Datacentre Buildout?<\/a><\/li>\n<li><a href=\"#thailand-lifts-clean-power-cap\">Thailand Lifts Clean-Power Cap<\/a><\/li>\n<li><a href=\"#what-does-harvard-research-add\">What Does Harvard Research Add?<\/a><\/li>\n<li><a href=\"#what-should-business-owners-watch\">What Should Business Owners Watch?<\/a><\/li>\n<li><a href=\"#key-considerations\">Key Considerations<\/a><\/li>\n<li><a href=\"#what-to-do-now\">What to Do Now<\/a><\/li>\n<li><a href=\"#faq\">FAQ<\/a><\/li>\n<li><a href=\"#try-the-business-directory\">Try the business directory<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 id=\"how-much-electricity-will-datacentres-consume\" data-toc=\"1\">How Much Electricity Will Datacentres Consume?<\/h2>\n<p>The IEA expects the world\u2019s datacentres to consume twice as much electricity by 2030 as they do today. Artificial intelligence will account for three-quarters of that growth, according to the agency.<\/p>\n<p>Within four years, AI datacentres are expected to consume an additional 350 terawatt-hours of electricity each year. The IEA says that amount is more than Great Britain\u2019s annual electricity consumption.<\/p>\n<p>The agency\u2019s forecasts are based on annual global shipments of AI servers, which have increased eighteenfold since 2020, and space-based imagery of 93 large \u201cAI factories.\u201d It estimates that global datacentre capacity rose tenfold in 24 months to 17 gigawatts. Their combined capacity is expected to reach about 50 gigawatts when those AI factories are completed.<\/p>\n<h2 id=\"why-are-datacentre-emissions-expected-to-rise\" data-toc=\"1\">Why Are Datacentre Emissions Expected to Rise?<\/h2>\n<p>Fossil-fuel generation is expected to grow faster than renewable-energy procurement for the sector, particularly in the US and China. The IEA projects that datacentres will generate 70% more carbon emissions by 2030 because of the increased use of fossil fuels.<\/p>\n<p>Datacentre developers are also described as the world\u2019s largest corporate buyers of renewable energy, with purchases intended to supply their servers and connect them to local power grids. The IEA found that datacentre developers have emerged as the world\u2019s biggest corporate buyers of renewable energy, while the appetite for fossil fuels is expected to grow even faster.<\/p>\n<p>The report also says the energy market faces continued uncertainty following the Middle East war, which the IEA has described as its greatest energy-market disruption. Fatih Birol, the IEA\u2019s executive director, said: \u201cI don\u2019t see any credible pathway for the energy world to return to the way it was before.\u201d<\/p>\n<h2 id=\"how-will-the-us-and-china-power-their-datacentres\" data-toc=\"1\">How Will the US and China Power Their Datacentres?<\/h2>\n<p>The US is expected to obtain about 60% of the electricity used by its datacentres from gas by 2030. In August, plans connected roughly 180 gigawatts of new gas-fired capacity with US datacentres, according to the IEA. That is almost as much new gas capacity as the amount currently installed across the European Union.<\/p>\n<p>The IEA reports that US datacentre developers\u2019 appetite for gas power is more than 16 times higher than in Canada, where plans for 11 gigawatts of gas generation were identified. AI developers across the rest of the world put forward plans for only 4 gigawatts of combined new gas capacity.<\/p>\n<p>China\u2019s AI datacentres are expected to receive about half their electricity from coal plants by the end of the decade. Renewables are expected to provide the remainder, with smaller amounts from nuclear reactors and very little from gas plants.<\/p>\n<p>In the EU, the IEA expects renewables to supply about 70% of datacentre electricity by 2030. Nuclear power and gas generation are expected to follow, with very small quantities coming from coal.<\/p>\n<h2 id=\"how-large-is-the-datacentre-buildout\" data-toc=\"1\">How Large Is the Datacentre Buildout?<\/h2>\n<p>The existing global stock of datacentres, including facilities with AI-optimised servers, stands at 120 gigawatts. China, the US and the EU account for 80% of that capacity.<\/p>\n<p>Another 120 gigawatts are expected to be built by the end of the decade under the IEA\u2019s central scenario. Three-quarters of this new capacity is expected to consist of AI datacentres.<\/p>\n<h2 id=\"thailand-lifts-clean-power-cap\" data-toc=\"1\">Thailand Lifts Clean-Power Cap<\/h2>\n<p>In 2026, <a href=\"https:\/\/www.nationthailand.com\/news\/40070384\" target=\"_blank\" rel=\"noopener\">Thailand Lifts Clean-Power Cap<\/a>. Thailand eliminated a 2,000-megawatt cap on direct clean-power trading that had previously applied exclusively to data centres. The scheme was opened to every industry that needs electricity.<\/p>\n<p>The ministry created an electricity-user category specifically for data centres, which may help prevent their demand from pushing up bills for households and other industries.<\/p>\n<p>About 60% of Thailand\u2019s electricity was generated from natural gas, and the country did not produce enough domestically.<\/p>\n<h2 id=\"what-does-harvard-research-add\" data-toc=\"1\">What Does Harvard Research Add?<\/h2>\n<p>A study led by the Harvard T.H. Chan School of Public Health and the Harvard Data Science Initiative examined 403 hyperscale datacentre facilities across the US for May 2024 through April 2025. It estimated that these facilities used between 68 and 99 terawatt-hours of electricity during that period, depending on operating conditions.<\/p>\n<p>The study, published in Nature Sustainability, found that hyperscale datacentre demand represented approximately 1.8% of total US electricity consumption. Harvard researchers associated it with about 25.7 million metric tons of carbon dioxide emissions.<\/p>\n<p>About 54% of the electricity powering the facilities came from fossil fuels, including natural gas at 38% and coal at 15%. About one-quarter of the electricity came from grid regions with higher-than-average carbon intensity.<\/p>\n<p>The Harvard study used satellite imagery to identify the 403 facilities and EPA data to attribute emissions based on each regional grid\u2019s power-plant mix. The researchers also noted substantial differences among regions. Virginia, Oregon, Ohio and Iowa together accounted for more than half of the electricity use covered by the study.<\/p>\n<h2 id=\"what-should-business-owners-watch\" data-toc=\"1\">What Should Business Owners Watch?<\/h2>\n<p>Online infrastructure is expanding alongside the AI systems used by businesses. The IEA\u2019s capacity figures describe datacentre growth and its energy sources, while the Harvard study estimates the electricity demand and carbon emissions associated with US hyperscale facilities. For businesses planning their online operations, these figures provide context for the scale of infrastructure expansion behind AI services.<\/p>\n<p>For visibility in AI search answers, businesses can use <a href=\"https:\/\/bizscoreai.com\">BizScoreAI<\/a> for AI-powered business score tracking and to view what an AI agent finds when it tests a website.<\/p>\n<h2 id=\"key-considerations\" data-toc=\"1\">Key Considerations<\/h2>\n<ul>\n<li>The IEA figures are forecasts for 2030, based partly on server shipments and satellite observations of datacentre construction.<\/li>\n<li>Global datacentre capacity stands at 120 gigawatts, with a further 120 gigawatts expected under the IEA\u2019s central base-case scenario.<\/li>\n<li>The Harvard study covers 403 US hyperscale facilities and estimates emissions from regional electricity generation mixes.<\/li>\n<li>Power sources differ sharply among the US, China, the EU, Canada and other markets.<\/li>\n<li>Both the IEA forecast and Harvard research describe fast-changing infrastructure, with actual development continuing after the Harvard study period ended in April 2025.<\/li>\n<\/ul>\n<h2 id=\"what-to-do-now\" data-toc=\"1\">What to Do Now<\/h2>\n<ol>\n<li>Review your business listing for consistent, current information.<\/li>\n<li>Check how your business appears in AI search answers.<\/li>\n<li>Record the AI tools and online services your business relies on.<\/li>\n<li>Review published information about your energy, environmental and operational commitments.<\/li>\n<li>Keep a record of the AI platforms and search engines where customers find your business.<\/li>\n<\/ol>\n<h2 id=\"faq\" data-toc=\"1\">FAQ<\/h2>\n<h3>How Much More Electricity Will Datacentres Use by 2030?<\/h3>\n<p>The IEA expects global datacentre electricity consumption to double by 2030 compared with today. AI is expected to account for three-quarters of that growth.<\/p>\n<h3>How Much More Carbon Emissions Will Datacentres Create?<\/h3>\n<p>The IEA expects emissions associated with datacentres to rise by 70% by 2030 as fossil-fuel generation expands.<\/p>\n<h3>How Much Extra Electricity Will AI Datacentres Consume?<\/h3>\n<p>AI datacentres are expected to consume an additional 350 terawatt-hours of electricity each year by 2030, more than Great Britain\u2019s annual electricity consumption.<\/p>\n<h3>What Share of US Datacentre Electricity Is Expected to Come From Gas?<\/h3>\n<p>About 60% of the electricity required by US datacentres is expected to come from gas by 2030.<\/p>\n<h3>How Much Electricity Do US Hyperscale Datacentres Use?<\/h3>\n<p>A Harvard-led study estimated that 403 hyperscale facilities used between 68 and 99 terawatt-hours of electricity from May 2024 through April 2025, depending on operating conditions.<\/p>\n<h2 id=\"try-the-business-directory\" data-toc=\"1\">Try the business directory<\/h2>\n<p><a href=\"https:\/\/bizscoreai.com\/business-search\/\"><img decoding=\"async\" data-src=\"https:\/\/bizscoreai.com\/wp-content\/uploads\/2026\/04\/BizScoreAI-Social-image.jpg\" alt=\"BizScoreAI, which includes the business directory\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" class=\"lazyload\" \/><\/a><\/p>\n<p>BizScoreAI scores how visible a business is to AI search and shows what its listing looks like to the engines people ask. <a href=\"https:\/\/bizscoreai.com\/business-search\/\">Open the business directory<\/a>.<\/p>\n<section class=\"post-sources\">\n<h2>Sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.theguardian.com\/world\/2026\/nov\/19\/datacentres-to-create-70-more-carbon-emissions-by-2030-iea-report-warns\" target=\"_blank\" rel=\"noopener nofollow\">theguardian.com<\/a><\/li>\n<li><a href=\"https:\/\/hsph.harvard.edu\/news\/hyperscale-data-centers-energy-consumption-carbon-emissions-newly-estimated-by-researchers\/\" target=\"_blank\" rel=\"noopener nofollow\">hsph.harvard.edu<\/a><\/li>\n<li><a href=\"http:\/\/news.mit.edu\/2014\/how-count-methane-emissions-0425\" target=\"_blank\" rel=\"noopener nofollow\">news.mit.edu<\/a><\/li>\n<li><a href=\"https:\/\/oadoi.org\/10.12465\/j.issn.0253-4339.2025.01.079\" target=\"_blank\" rel=\"noopener nofollow\">oadoi.org<\/a><\/li>\n<li><a href=\"https:\/\/www.nationthailand.com\/news\/40070384\" target=\"_blank\" rel=\"noopener nofollow\">nationthailand.com<\/a><\/li>\n<\/ul>\n<\/section>\n<p>HTML<br \/>\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"How Much More Electricity Will Datacentres Use by 2030?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The IEA expects global datacentre electricity consumption to double by 2030 compared with today. AI is expected to account for three-quarters of that growth.\"}},{\"@type\":\"Question\",\"name\":\"How Much More Carbon Emissions Will Datacentres Create?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The IEA expects emissions associated with datacentres to rise by 70% by 2030 as fossil-fuel generation expands.\"}},{\"@type\":\"Question\",\"name\":\"How Much Extra Electricity Will AI Datacentres Consume?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"AI datacentres are expected to consume an additional 350 terawatt-hours of electricity each year by 2030, more than Great Britain\u2019s annual electricity consumption.\"}},{\"@type\":\"Question\",\"name\":\"What Share of US Datacentre Electricity Is Expected to Come From Gas?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"About 60% of the electricity required by US datacentres is expected to come from gas by 2030.\"}},{\"@type\":\"Question\",\"name\":\"How Much Electricity Do US Hyperscale Datacentres Use?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A Harvard-led study estimated that 403 hyperscale facilities used between 68 and 99 terawatt-hours of electricity from May 2024 through April 2025, depending on operating conditions.\"}}]}]}<\/script><\/p>\n<hr style=\"margin:2.5em 0 1em;opacity:.35\" \/>\n<p style=\"font-size:.85em;opacity:.7\">See our <a href=\"https:\/\/bizscoreai.com\/blog\/disclaimer\/\">editorial disclaimer<\/a> for how our articles are produced.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Datacentre electricity demand is forecast to double by 2030 as AI drives expansion, while sector emissions could rise by 70%.<\/p>\n","protected":false},"author":1,"featured_media":401772,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_title":"Datacentre Emissions to Rise 70% by 2030","rank_math_description":"IEA forecasts rising datacentre electricity use and 70% more carbon emissions by 2030 as AI drives global expansion.","rank_math_focus_keyword":"datacentre carbon emissions","footnotes":""},"categories":[1],"tags":[],"class_list":["post-401773","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ai-news"],"elementor_data":null,"elementor_edit_mode":null,"_links":{"self":[{"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/posts\/401773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/comments?post=401773"}],"version-history":[{"count":1,"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/posts\/401773\/revisions"}],"predecessor-version":[{"id":401774,"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/posts\/401773\/revisions\/401774"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/media\/401772"}],"wp:attachment":[{"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/media?parent=401773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/categories?post=401773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bizscoreai.com\/blog\/wp-json\/wp\/v2\/tags?post=401773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}